THERMAL POWER PLANT PERFORMANCE TESTING

03 – 05 DECEMBER 2018, KUALA LUMPUR, MALAYSIA

About The Course

This seminar provides detailed description of all the performance testing methods for all thermal power plant equipment including boilers, turbines, condensers, pumps, fans, deaerators, and feedwater heaters.  The methodology, and code requirements for the performance tests for all thermal power plant equipment will be covered thoroughly in this seminar.  The preparatory work and instrumentation required for each test will be described in detail in this seminar.  The efficiency calculations for all the equipment used in circulating fluidized-bed (CFB) boiler and pulverized coal boiler power plants will be covered in-depth in this seminar.  All the processes, operational and maintenance activities, capital projects, technical options, potential initiatives and incentives to implement upgrades/repairs for increasing the power plant equipment efficiency will also be covered in detail.  This seminar will also provide a thorough explanation of CFB and pulverized coal boiler technology including hydrodynamics, combustion, emissions, design considerations, gas-solid separators, design of CFB and pulverized coal boiler components, management of solid residues, materials, stoichiometric calculations, and model for sulfur capture. The operation, maintenance, testing, and refurbishment options of all the equipment and systems used in CFB and pulverized coal power plants will be covered in detail including, boilers, superheaters, reheaters, turbines, condensers, feedwater heaters, deaerators, pumps, compressors, fans, electric generators, instrumentation and control systems, and governing systems, etc.   All the factors which affect CFB and pulverized coal boiler power plant efficiency and emissions will be explained thoroughly.  All the methods used to calculate the heat rate of CFB and pulverized coal power plants will be covered in detail. All the areas in CFB and pulverized coal boiler power plants where efficiency loss can occur will be explained. This seminar will also provide up-dated information in respect to the following methods used to improve CFB boiler and pulverized coal boiler power plant heat rate:

  • Optimizing the Combustion Process and Sootblowing
  • Controlling the Steam Temperature
  • Recovering Moisture from Boiler Flue Gas
  • Performing Steam Turbine Maintenance
  • Lowering Condenser Back Pressure
  • Pre-drying High Moisture Coal and Reducing Stack Temperature

Learning Outcomes

  • Thermal Plant Performance Testing: Gain a thorough understanding of all the performance testing methods for all thermal power plant equipment including boilers, turbines, condensers, pumps, fans, deaerators, and feedwater heaters.
  • Performance Test Methodology and Code Requirements: Understand the methodology, and code requirements for the performance tests of all thermal power plant equipment
  • Performance Test Preparatory Work and Instrumentation: Learn about the preparatory work and instrumentation required for each equipment performance test in a thermal power plant
  • Equipment Efficiency Calculations: Gain a thorough understanding of the efficiency calculations for all the equipment used in circulating fluidized-bed (CFB) boilers and pulverized coal boilers power plants
  • Calculating the Heat Rate of CFB and Pulverized Coal Boiler Power Plants: Learn all the methods used to calculate the heat rate of CFB and pulverized coal boiler coal power plants
  • Benefits of Lowering the Heat Rate of CFB and Pulverized Coal Boiler Power Plants: Understand all the benefits of lowering the heat rate of circulating fluidized-bed boiler coal power plants
  • Methods Used to Improve CFB and Pulverized Coal Boiler Power Plants Heat Rate: Gain a thorough understanding of all the methods used to improve the heat rate of CFB and pulverized boiler coal power plants
  • Processes, Operational and Maintenance Activities in CFB and Pulverized Coal Boiler Power Plants: Discover all the processes, operational and maintenance activities used to improve the heat rate of CFB and pulverized coal power plants
  • Capital Projects Used to Improve the Heat Rate of CFB and Pulverized Coal Boiler Power Plants: Learn about all the capital projects used to improve the heat rate of CFB and pulverized coal power plants
  • Technical Options for Improving the Heat Rate of CFB and Pulverized Coal Boiler Power Plants: Understand all the technical options used to improve the heat rate of CFB and pulverized coal boiler power plants
  • Potential Initiatives and Incentives to Implement Upgrades/Repairs for Improving the Heat Rate of CFB and Pulverized Coal Bed Boiler Power Plants: Discover all the potential initiatives and incentives to implement upgrades/repairs for improving the heat rate of CFB and pulverized coal power plants
  • Factors Affecting CFB and Pulverized Coal Boiler Power Plants Efficiency and Emissions: Learn about all the factors which affect CFB and pulverized coal boiler power plants efficiency and emissions
  • Areas in CFB and Pulverized Coal Power Plants where Efficiency Loss Can Occur: Discover all the areas in CFB and pulverized coal power plants where efficiency loss can occur
  • Optimize the Operation of CFB and Pulverized Coal Power Plant Equipment and Systems to Improve the Plant Heat Rate: Understand all the techniques and methods used to optimize the operation of CFB and pulverized coal power plant equipment and systems to improve the plant heat rate
  • CFB and Pulverized Coal Power Plant Equipment and Systems: Learn about various types of CFB and pulverized coal power plant equipment and systems including: boilers, superheaters, reheaters, steam turbines, governing systems, deaerators, feedwater heaters, coal-handling equipment, transformers, generators and auxiliaries

Who Should Attend

  • Engineers of all disciplines
  • Managers
  • Technicians
  • Maintenance personnel
  • Other technical individuals

Course Faculty

The trainer has been a teacher at University of Toronto and Dalhousie University, Canada for more than 25 years. In addition, He has taught courses and seminars to more than four thousand working engineers and professionals around the world, specifically Europe and North America. He has been consistently ranked as “Excellent” or “Very Good” by the delegates who attended his seminars and lectures.

 

The trainer wrote 5 books for working engineers from which three have been published by McGraw-Hill, New York.  Below is a list of the books authored by him:

  1. Power Generation Handbook: Gas Turbines, Steam Power Plants, Co-generation, and Combined Cycles, second edition, (800 pages), McGraw-Hill, New York, October 2011.
  2. Electrical Equipment Handbook (600 pages), McGraw-Hill, New York, March 2003.
  3. Power Plant Equipment Operation and Maintenance Guide (800 pages), McGraw-Hill, New York, January 2012.
  4. Industrial Instrumentation and Modern Control Systems (400 pages), Custom Publishing, University of Toronto, University of Toronto Custom Publishing (1999).
  5. Industrial Equipment (600 pages), Custom Publishing, University of Toronto, University of Toronto, University of Toronto Custom Publishing (1999).

 

The trainer has received the following awards:

  1. The first “Excellence in Teaching” award offered by Poweredge Asia Training center, Singapore, December 2016
  2. The first “Excellence in Teaching” award offered by the Professional Development Center at University of Toronto (May, 1996).
  3. The “Excellence in Teaching Award” in April 2007 offered by TUV Akademie (TUV Akademie is one of the largest Professional Development centre in world, it is based in Germany and the United Arab Emirates, and provides engineering training to engineers and managers across Europe and the Middle East).
  4. Awarded graduation “With Distinction” from Dalhousie University when completed Bachelor of Engineering degree (1983).
  5. Entrance Scholarship to University of Ottawa (1984).
  6. Natural Science and Engineering Research Counsel (NSERC) scholarship towards graduate studies – Master of Applied Science in Engineering (1984 – 1985).

 

TOPICS COVERED

Thermal Plant Performance Testing

Performance Test Methodology and Code Requirements

Performance Test Preparatory Work and Instrumentation

Equipment Efficiency Calculations

Calculating the Heat Rate of CFB and Pulverized Coal Boiler Power Plants

Benefits of Lowering Heat Rate

This training course has a limited attendance for up to 20 participants only. Sessions commence at 9am on all days, with short intervals at 10.30am and 3.30pm respectively. Refreshments will be provided in the short intervals. Lunch will be provided at 12:30pm for 1 hour. Sessions will end at 5pm on all days.

Unique Features with powerEDGE Training

• Pre-Course Questionnaire to help us focus on your learning objectives
• Detailed Course & Reference Manual for Continuous Learning and Sharing
• Practical Exercises & Case Examples to better understand the principles
• Limited class size to ensure One-to-One Interactivity
• Assessment at the end of the course to help you develop a Personal Action Plan